newskoseli.Com

Traffic resumes at Narayangadh-Muglin road stretch

The vehicular movement along the Narayangadh-Muglin road stretch resumed after landslide debris was removed from Khalikhola area.

The landslide struck at 4:00 am blocking traffic movement and was cleared at 7:30 am. The road has started resuming from both the side, Chitwan’s Superintendent of Police (SP) Basanta Bahadur Kunwar said.

The vehicles that were stranded for at least two hours have headed to their destinations, police said. More than 7,000 vehicles pass by this section of the highway everyday.

मिति परिवर्तन गर्नुहोस् [Date Converter]–


Powered by © nepali date converter

फेसबुकबाट न्युजकोसेलीसँग जोडिनुहोस्–

आजको विनिमय दर